Image 1 of 1

003_0687.jpg

Add to Cart Add to Lightbox Download
11/15/2016, Boulder, Colorado, Pearl Street Mall County Courthouse and Wells Fargo Branch. These were two peaceful protests with music and speeches to rally people to say no to the Dakota Access pipeline (#NoDAPL). From www.nodaplsolidarity.org website:

The “Dakota Acces” Pipeline (DAPL) is a $3.8B, 1,100 mile fracked-oil pipeline currently under construction from the Bakken shale fields of North Dakota to Peoria, Illinois. DAPL is slated to cross Lakota Treaty Territory at the Standing Rock Sioux Reservation where it would be laid underneath the Missouri River, the longest river on the continent.
Copyright
Joshua Ruschhaupt, Climate Photography
Image Size
7360x4912 / 17.6MB
CO
Contained in galleries
#NoDAPL
11/15/2016, Boulder, Colorado, Pearl Street Mall County Courthouse and Wells Fargo Branch. These were two peaceful protests with music and speeches to rally people to say no to the Dakota Access pipeline (#NoDAPL). From www.nodaplsolidarity.org website: <br />
<br />
The “Dakota Acces” Pipeline (DAPL) is a $3.8B, 1,100 mile fracked-oil pipeline currently under construction from the Bakken shale fields of North Dakota to Peoria, Illinois. DAPL is slated to cross Lakota Treaty Territory at the Standing Rock Sioux Reservation where it would be laid underneath the Missouri River, the longest river on the continent.